-
Recent Posts
Archives
Meta
Blogroll
Category Archives: Windows and Siding
Siding Installation: promises versus reality
So the windows took up 3 days to install 10 windows, and there are 19 more that will need installation hopefully before Christmas (and we are getting snow tomorrow night!). Again, we were told by Stacey Skelton at Lowes that … Continue reading
Posted in Windows and Siding
Leave a comment
Dryer Vent
The installers wrapped the street-side short wall in Tyvek and didn’t cut a hole through for the dryer. We have not been able to wash and dry clothes for a week now. Shawn Adams said he was going to get the … Continue reading
Posted in Windows and Siding
Leave a comment
Work Schedule
This is more of a reference for storing the work schedule of the installers rather than anything else. Windows Nov. 17 – installation begins – demolition may have begun on some windows and casing began but no new windows installed. … Continue reading
Posted in Windows and Siding
Leave a comment
Siding Schedule Sliding
So much for scheduling. So Shawn (Adams Home Exteriors) said the installation would begin straight after Thanksgiving. Well that didn’t happen, and then he said the installers had to finish up other projects on Monday and Tuesday, November 27th and … Continue reading
Posted in Windows and Siding
Leave a comment